Skip to content
1900

Optimal Development of Alternative Fuel Station Networks Considering Node Capacity Restrictions

Abstract

A potential solution to reduce greenhouse gas (GHG) emissions in the transport sector is the use of alternative fuel vehicles (AFV). As global GHG emission standards have been in place for passenger cars for several years, infrastructure modelling for new AFV is an established topic. However, as the regulatory focus shifts towards heavy-duty vehicles (HDV), the market diffusion of AFV-HDV will increase as will planning the relevant AFV infrastructure for HDV. Existing modelling approaches need to be adapted, because the energy demand per individual refill increases significantly for HDV and there are regulatory as well as technical limitations for alternative fuel station (AFS) capacities at the same time. While the current research takes capacity restrictions for single stations into account, capacity limits for locations (i.e. nodes) – the places where refuelling stations are built such as highway entries, exits or intersections – are not yet considered. We extend existing models in this respect and introduce an optimal development for AFS considering (station) location capacity restrictions. The proposed method is applied to a case study of a potential fuel cell heavy-duty vehicle AFS network. We find that the location capacity limit has a major impact on the number of stations required, station utilization and station portfolio variety.

Funding source: German Federal Ministry of Research and Education; Ministry of Science, Research and the Arts and the Ministry of Economic Affairs, Labour and Housing
Related subjects: Applications & Pathways
Countries: Germany
Loading

Article metrics loading...

/content/journal1580
2020-01-07
2024-04-24
http://instance.metastore.ingenta.com/content/journal1580
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error