Abstract

The H21 Leeds City Gate project is a study with the aim of determining the feasibility, from both a technical and economic viewpoint, of converting the existing natural gas network in Leeds, one of the largest UK cities, to 100% hydrogen. The project has been designed to minimise disruption for existing customers, and to deliver heat at the same cost as current natural gas to customers. The project has shown that:

  • The gas network has the correct capacity for such a conversion
  • It can be converted incrementally with minimal disruption to customers
  • Minimal new energy infrastructure will be required compared to alternatives
  • The existing heat demand for Leeds can be met via steam methane reforming and salt cavern storage using technology in use around the world today

The project has provided costs for the scheme and has modelled these costs in a regulatory finance model. In addition, the availability of low-cost bulk hydrogen in a gas network could revolutionise the potential for hydrogen vehicles and, via fuel cells, support a decentralised model of combined heat and power and localised power generation.
This report and any attachment is freely available on the ENA Smarter Networks Portal here. IGEM Members can download the report and any attachment directly by clicking on the pdf icon above.

Funding source: Network Innovation Allowance (NIA)
Countries: United Kingdom
Loading

Article metrics loading...

/content/project327
2016-07-11
2024-04-23
http://instance.metastore.ingenta.com/content/project327
Loading

Supplements

Northern Gas Networks H21 Leeds City Gate film

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error