Skip to content
1900

A Review of Projected Power-to-Gas Deployment Scenarios

Abstract

Technical, economic and environmental assessments of projected power-to-gas (PtG) deployment scenarios at distributed- to national-scale are reviewed, as well as their extensions to nuclear-assisted renewable hydrogen. Their collective research trends, outcomes, challenges and limitations are highlighted, leading to suggested future work areas. These studies have focused on the conversion of excess wind and solar photovoltaic electricity in European-based energy systems using low-temperature electrolysis technologies. Synthetic natural gas, either solely or with hydrogen, has been the most frequent PtG product. However, the spectrum of possible deployment scenarios has been incompletely explored to date, in terms of geographical/sectorial application environment, electricity generation technology, and PtG processes, products and their end-uses to meet a given energy system demand portfolio. Suggested areas of focus include PtG deployment scenarios: (i) incorporating concentrated solar- and/or hybrid renewable generation technologies; (ii) for energy systems facing high cooling and/or water desalination/treatment demands; (iii) employing high-temperature and/or hybrid hydrogen production processes; and (iv) involving PtG material/energy integrations with other installations/sectors. In terms of PtG deployment simulation, suggested areas include the use of dynamic and load/utilization factor-dependent performance characteristics, dynamic commodity prices, more systematic comparisons between power-to-what potential deployment options and between product end-uses, more holistic performance criteria, and formal optimizations.

Related subjects: Policy & Socio-Economics
Loading

Article metrics loading...

/content/journal3357
2018-07-21
2024-04-19
http://instance.metastore.ingenta.com/content/journal3357
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error