The Hydrogen Storage Challenge: Does Storage Method and Size Affect the Cost and Operational Flexbility of Hydrogen Supply Chains?

Abstract

Hydrogen is seen as a key energy vector in future energy systems due to its ability to be stored in large volumes for long periods, providing energy flexibility and security. Despite the importance of storage in hydrogen's potential role in a zero-carbon energy system, many techno-economic analyses fail to adequately model different storage methods in hydrogen supply chains, often ignoring storage requirements altogether. Therefore, this paper uses a data-driven techno-economic analysis (TEA) tool to examine the effect of storage size and cost on three different 2030 hydrogen supply chain scenarios: wind-based, solar-based, and mixed-source grid electrolysis. For varying storage sizes and specific capital costs, the overall levelised cost of hydrogen (LCOH), including production, storage, and delivery to a constant demand, varies significantly. The LCOH ranges from V3.90 e12.40/kgH2, V5.50e12.75/kgH2, and V2.80e15.65/kgH2 for the wind-based, solar-based, and mixed-source grid scenarios respectively, with lower values for scenarios with low-cost storage. This highlights the critical role of low-cost hydrogen storage in realising the energy flexibility and security electrolytic hydrogen can provide.

Funding source: The authors acknowledge funding support from the Sustainable Energy Authority of Ireland (SEAI) and Gas Networks Ireland under the SEAI Research, Development & Demonstration Funding Programme 2019, Grant number 19/RDD/445. The authors acknowledge support from the Ryan Institute at Ollscoil na Gaillimhe e University of Galway, and MaREI, the SFI Research Centre for Energy, Climate and Marine.
Related subjects: Policy & Socio-Economics
Countries: Ireland
Loading

Article metrics loading...

/content/journal4833
2023-06-24
2024-04-27
http://instance.metastore.ingenta.com/content/journal4833
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error